Renovation & transformation Allseas te Delft
Several high-end structural glass and steel components by IFS Building Systems are featured in this architectural transformation and innovation project.
IFS Building Systems has been commissioned by Heembouw to:
- Engineer and build transparent structural glass facades between the two existing stairwells.
- Create a new main entrance, including warm curved glass.
- Add an extra layer to the existing building with a beautifully designed addition, featuring partial warm curved glass and a project-specific glazing system.
This project demonstrates the potential for increased transparency and reduced material usage in modern transformation constructions.
Projectgegevens
| Opdrachtgever | Heembouw |
| Architect | Heembouw Architecten / Moka Architecten |
| Uitvoering | Q3 2021 |
-
#transparantearchitectuur
IFS -
#transparantearchitectuur
IFS -
#transparantearchitectuur
IFS -
#transparantearchitectuur
IFS -
#transparantearchitectuur
IFS -
#transparantearchitectuur
IFS -
#transparantearchitectuur
IFS -
#transparantearchitectuur
IFS -
#transparantearchitectuur
IFS -
#transparantearchitectuur
IFS -
#transparantearchitectuur
IFS -
#transparantearchitectuur
IFS -
#transparantearchitectuur
IFS -
#transparantearchitectuur
IFS -
#transparantearchitectuur
IFS -
#transparantearchitectuur
IFS